Wednesday, November 22, 2006

Drywall

As I said in the last post, we removed the drywall on the walls between the kitchen and the bathroom, and the cabinet wall in the kitchen. This accomplished two things; it made the job of removing the linoleum wall covering much easier, and it opened the wall to allow access for the plumbing installation next spring. If time allows, I may replace the electrical wiring in this part of the house since it is in the open.



Along with the drywall, we removed the bathroom sink, and the toilet. The bathroom is now ready for a tear out and replacement of the floor. The idea is to make it the same level as the rest of the house, as it is higher than the concrete slab.

No comments: