Once the items are removed from the area, CMV and AMV are going to paint the walls and ceiling. Our plan is to install a wooden floor that can be removed in sections if the need arises. I am unsure how dry the area stays in the winter. It has been a bare concrete floor for so long, that I don't know how the elements will treat the wood. We are going to use a pine plank and then paint it to resemble an old porch floor.

The only picture I have is of the porch almost cleaned out. You can see the futon frame and some trim against the wall.